Promoting Sustainability through Engineering
Energy · Cities · Environment
On Apr.14, 2018, a prototype of wind turbine on the 120m reinforced concrete tower developed by ECIDI independently was combined to the grid smoothly.
Located at the No.10 position of the Jiujiang Jiuyunling Wind Farm Project Phase II invested by Zhongtianwanhe Energy Investment Co., Ltd., the prototype of Windey WD115-2000 type is installed on a tower with a
In recent years, the reinforced concrete tower is a new product launched by the domestic wind power industry for low wind speed regions. It features a high wheel hub, high structural stiffness and high natural frequency, no loss of generated energy due to “frequency cross-over” and matching the “low wind speed and high shear” characteristics of low wind speed regions perfectly, having significant impacts on the domestic onshore wind power development and attracting wind turbine manufacturers to introduce the foreign technology. In the context, ECIDI formed a concrete tower research team based on its actual conditions to develop the concrete tower technology independently and has completed many innovative designs. The smooth implementation of the project is another successful try and innovation made by ECIDI in the new wind turbine tower field, expanding its wind power project design scope and improving its core competitiveness in the onshore wind power field.