Brazil
Powerchina Huadong Engineering Corporation Limited built our office in Brazil since 2018. We possess the Full-Range Capabilities, from conceptual design to construction and
O&M of Power, Infrastructure and Water Affairs Sectors.
We are executing two projects in Brazil: R&D project named Development and Application of a reference manual for Reversible Hydropower Plant projects and HPP Sao Simao
Modernization Project with installed capacity of 1710MW, located on the boarder of the States of Minas Gerais and Goiás, between the cities of Santa Vitória (MG) and São Simão(GO).
Contact
Ms. Veronica Fu Jie
☎️ +55 11 971683651; +86 18518025653
📍 Rúa Olimpiadas, No.194, 9o floor, Vila Olimpia,São Simão City